Earth Auger Drill Excavator Planting Machine

earth auger drill excavator planting machine has the characteristics of beautiful appearance, strong power, stable performance, high efficiency and energy saving. it is widely used in gardening, planting of various medium and small saplings, flowers and tea trees, fast-growing poplar, afforestation, eucalyptus planting, tree fertilization, yam burdock Perforated planting; vineyards, banana gardens and other pillars, greenhouse shed columns, optical cable marking piles, fence column piles, pasture fences, highways, railway steel mesh fences and other holes for drilling and other operations.

Send InquiryChat Now
Product Details

Product details

Model: 3WT-150A
Engine: 1E44F-28
Displacement: 52
Power: 1.4
Fuel tank: 1200
Weight: 9.5/11 

Product description

earth auger drill excavator planting machine has the characteristics of beautiful appearance, strong power, stable performance, high efficiency and energy saving. it is widely used in gardening, planting of various medium and small saplings, flowers and tea trees, fast-growing poplar, afforestation, eucalyptus planting, tree fertilization, yam burdock Perforated planting; vineyards, banana gardens and other pillars, greenhouse shed columns, optical cable marking piles, fence column piles, pasture fences, highways, railway steel mesh fences and other holes for drilling and other operations.

Product work show

 

Product Instructions

 

 

  First, preparation before starting the machine

 

    1. Guarantee no people or animals around.

 

    2. Carefully check the ground drill to ensure that the machine is in a safe state.

 

    3. Hit the throttle to the low speed position.

 

    4. Ensure that the distance between the ground drill and the fueling point is more than 3 meters.

 

  Second, start

 

    1. Push the parking switch to the "on" position.

 

    2. Press and hold the oiler on the carburetor until oil flows out of the clear plastic tube.

 

    3. Push the choke handle and properly close the choke: when the cold start, the choke is completely closed in winter and partially closed in summer; the hot start does not need to be closed.

 

    4. Pull the starter 3-5 times to make the fuel enter the cylinder. Then quickly pull the starter until the engine is started.

 

Note: After starting the engine, gently release the starter drawstring with the application hand. If the starter rope is quickly retracted, it will cause damage to the starter.

 

    5. After confirming the start, fully open the choke, make the gasoline engine idle for 3~5 minutes to preheat, then slowly move the throttle switch to accelerate the gasoline engine to the working speed and enter the normal working state.

 

  Third, the operation

 

    The first four hours of the new machine's work should not be operated at full speed. The speed should be controlled at 4000-5000r/min to ensure that the machine can perform the running-in better.

 

  Fourth, stop

 

    1. Run the throttle control assembly to the idle position (ie the lowest position) for more than 30 seconds.

 

    2. Push the parking switch button.

 

Note: The single continuous operation time should not exceed 1 hour.


More contacts

 

Sonia Wang

 

Tel:0411-88530539

 

Fax:0411-88530539

 

Mobile:13610917420

 

E-mail:wangyong@dl-jnw.com

 

Skype:yong1993420

 

Whatapp:+8613610917420

 

imo:+8613610917420

 


 

 

Hot Tags: earth auger drill excavator planting machine, China, suppliers, manufacturers, factory, wholesale, buy, price, quotation, in stock, made in China
Inquiry